CONSTRUCTION MANAGEMENT
for manufacturing in Mexico
Construction Management
Integrating a constructibility analysis into the real estate strategy.
Improved project outcomes including quality and time
Minimizes potential construction change orders
Creates a buildable and biddable construction package
Construction Management
- Buildings, Facilities, Campus
- All Main Systems + Specialities
- Secondary Systems (Civil, Electrical, Mechanical)
Other Works
- Housing & Security Buildings
- Energy & Port Accesses
- Infrastructure (Roads, Bridges, Systems)
Design Engineering
- Architectural & Systems
- Civil Design with Detail Engineering
- Landscaping, Interiors, Utilities, Comfort, Special Requirements, Finishes & Facades
Technology:
- 3-D
- BIM
- Virtual Walkthroughs
- Intelligent Systems
Our Methodology
OPTION A
Text
- TBD
Industrial campus consisting of 62,300 m2 (670,000 ft2) for primary and secondary buildings.
- Heavy Machinery Gears Fabrication (United States)
- Production Building #1 - 24,600 m2
- Office Space - 2,100 m2
- Future Buildings #2 & #3 - 35,000 m2
- Production Building #1 - 24,600 m2
- Main substation: 115KV, 40MVA + Secondary: 5000KVA
- 3000 Gallons FPS Tank
Industrial campus consisting of 93,300 m2 (1M ft2) for ATV welding, assembly, and paint line.
Industrial campus consisting of 93,300 m2 (1M ft2) for ATV welding, assembly, and paint line.
Industrial campus consisting of 93,300 m2 (1M ft2) for ATV welding, assembly, and paint line.
Industrial campus consisting of 93,300 m2 (1M ft2) for ATV welding, assembly, and paint line.
Industrial campus consisting of 93,300 m2 (1M ft2) for ATV welding, assembly, and paint line.
INDUSTRIAL CONSTRUCTION PROJECTS
Experts in industrial construction in Mexico, meeting global standards
Our Solutions
Integrating a constructibility analysis into the real estate strategy improves the project outcomes including quality and time; minimizes potential construction change orders; and aims to create a buildable and biddable construction package.
Our Capabilities
- Buildings, Facilities, Campus
- All Main Systems + Specialities
- Secondary Systems (Civil, Electrical, Mechanical)
Commercial & Administrative Design:
- Architectural & Systems
- Civil Design with Detail Engineering
- Landscaping, Interlors, Utilities
- Comfort, Special Requirements
- Finishes & Facades
- Housing & Security Buildings
- Energy & Port Accesses
- Infrastructure (Roads, Bridges, Systems)
- 3D
- BIM
- Virtual Walks
- Intelligent Systems
Our Methodology
Our Experience
Industrial Campus Construction
Cienega de Flores, Nuevo León, MEXICO
Industrial Campus consisting of 62,300 square meters for primary and secondary buildings. Located in Cienega de Flores, Nuevo León, Mexico
- Heavy Machinery Gears Fabrication (United States)
-
Production Building #1 - 24,600 m2
- Office Space - 2,100 m2
- Future Buildings #2 & 3 - 35,000 m2
- Production Building 1: 24,600 m2
- Main substation: 115KV, 40MVA + Secondary: 5000KVA
- 3000 Gallons FPS Tank
Industrial Campus Expansion
Villagrán, Guanajuato, MEXICO.
- Expansion - 53,500 m2 - Primary & Secondary Buildings
- Improvements - 68,900 m2 - Roads & Outside Works
REQUEST FOR PROPOSAL
Let us answer all of your questions.INDUSTRIAL
CONSTRUCTION
PROJECTS
An industrial building with 8-in thick floors, a 33-foot deep pit to accommodate an industrial slitter, and an interior railway interchange.
View Case StudyAutomotive manufacturer launches new facility in Mexico with Prodensa's expertise, streamlining operations for USMCA compliance and operational success.
View Case StudyLuis Rodriguez Fremont
- +20 years of industrial project management experience
- Implemented +50 industrial construction projects throughout Mexico
- Projects in +10 industries including automotive, chemicals and electronics